The project is progressing

Suomirata gained momentum when the company responsible for project planning was established at the end of 2020. Suomi-rata Oy’s task is to design the rail infrastructure associated with the rail connection between Helsinki and Tampere via Helsinki-Vantaa Airport until it is ready for construction.

Future phases of Suomirata project:

  1. Preliminary studies;
  • A quick review of the mainline Helsinki-Tampere connection
  • Riihimäki-Tampere connection line development study
  • Impact assessment of alternatives
  1. Preparatory alignment plan and environmental impact assessment (EIA)
  • Let’s look at different track routes and their effects
  • EIA-compliant review (programme phase and evaluation phase)
  • Extensive interaction with key stakeholders
  1. General plan (in accordance with the Rail Tracks Act)
  • Specifying the plans for one main route
  • Specifying the impact assessments and cost estimate
  • Extensive interaction with key stakeholders
  • Approval of the General plan requires the plan to be consistent with the master plans
  1. Railway plan (in accordance with the Rail Tracks Act)
  • Specifying the General plan
  • Indicating the areas to be redeemed and taken over
  • Extensive interaction
  • Approval of the Railway plan requires consistency with the city plans